New Project 2003

Part 4 

The engine is currently at the machine shop for the block work.

The bare frame after sandblasting. After final preparation it was primed with DP epoxy primer

The rear with a fresh posi unit. The stock 3:31 gears were retained.

The frame was painted with Eastwoods Chassis black.

The frame back together. All new components including stainless lines and urethane bushings.

Rear of the frame complete.

 

 

www.firstgenerationmontecarlo.com

 

                             

                             

                             

                             

         

         

                             

          

          

          

        

Use back button to return to site from guest book.

e-mail  levanti@optonline.net